BUMP Roadworks: Part 1
BUMP Road Works’ weather window is closed again as it’s snowing/ super windy for the majority of the week, then it won’t be warm enough until likely Tuesday, Apr 28. So in the meantime, here are notes from my first three days of painting!
Sunday, Apr 19: Primed 2 coats per barrier x 4, burned back of neck. 3.5 hours of work
Monday, Apr 20: Picked up paints, 3 yellow coats per barrier x 2, freehanded outlines on 1 barrier, started blocking out purple silhouettes and testing teal accents, started coating purple (beginning of my costly mistake), sprayed sunscreen every hour. 6.5 hours of work
Tuesday, Apr 21: Continued coating purple base (noooooo), freehanded outlines on 2 more barriers, tested yellow on purple too late, wasted time being mad about it, started blocking out purple silhouettes, wore a bandana to save time spraying sunscreen. 7 hours of work




There usually comes a time during a project where I hate everything I’m doing, ha. Tuesday was that tipping point. The more I stared at my colours, the more I thought the yellow was too lemon-y (not warm enough) and the maroon was too dark. Once the yellow-on-purple test failed, my mind went into self-berating mode. I was probably dehydrated and tired from the relentless sun. I’d forgotten how physically demanding painting murals can be, and my body was wiped after two and a half days.
It’s a good thing we’re getting a weather window break! I’ve had time the past couple of days to rest up and reset my brain and my feelings of inadequacy. I washed all my brushes, because a week is too long to leave them in their plastic wrap and they might dry up. Turns out I didn’t wash them well enough so over half of them dried up anyway, and I’ll need to buy more.

Meanwhile, I have quite a bit of screen-based work to take care of before I go back to the paint site again. I’ll have more pics once these barriers are done! I tried taking videos for “content”, and I just can’t.

Until next time,
Ann






